A national offshore test field with up to 150 MW of generation capacity is to be built off the coast of Rostock-Warnemünde to research new technologies and innovations for a holistic energy transformation. With the shallow water depth and easily accessible port infrastructure provided by the Rostock seaport, the research-oriented wind farm has optimal site conditions and is scheduled to go into operation in 2025.